Wednesday, May 6, 2020

The Idea of Order at Key West Free Essays

â€Å" The Idea of Order at Key West† Wallace Stevens, a imaginative poet, created a wonderful world of desire in the poem â€Å"The Idea of Order at Key West†. Line after line, new perspectives and curious thoughts popped into my head. Stevens creates the desire to want to decipher his puzzle of a poem. We will write a custom essay sample on The Idea of Order at Key West or any similar topic only for you Order Now Stevens is a poet of many themes and perspectives, which led me to understand why I was coming up with so many different meanings behind this poem. In this particular poem, Key West being the muse, Stevens writes down the keys to the mystery, only to be unlocked if you dig deep into his poem. However, once unlocked, understanding the passion and mystery with each written word is a whole other activity. The speaker opens up the poem stating that â€Å"She sang beyond the genius of the sea. †Automatically, I am hit with a vision of a women standing on the shore, running away from the water as is grew closer to her toes, laughter being the song the sea couldn’t amount to. The speaker then goes on to say that she was not mind nor voice. Nonexistent? No. This presence was very much alive in the sense of motion. The speaker, draw in by it’s â€Å"empty†¦ mimic motion†, somehow understands the ovement. Emphasis on there being no physical form, but a being none the less. This possibly gives the speaker a sense of comfort. Being surrounded by a presence the speaker knew, but had a great desire to know more about it. In return, the speaker and company have empathy, constantly hearing a cry. The focus on a feminine figure was very obvious to me in th e beginning of this poem. However, as the poem carries along, I am torn between what I think and what Stevens meant it to be. Continuing along, the presence becomes more mysterious. An open book for she was not a mask no more than was the sea. Water, for the most part, is a transparent substance. It makes sense that the speaker would use this metaphor, being in Key West where the water is crystal. The speaker makes it apparent that the sound is not that of the sea, but of the presence, â€Å"The song and water were not medleyed sound†. The speaker starts to clearly separate the presence from the surroundings of Key West. On the other hand, using the surroundings, the speaker defines the presence. Up to this point in the poem, I was sure that the feminine figure he so carefully described was a love of his. A women he longed for, but couldn’t have. Once I read â€Å" she was the maker of the song she sang†, I changed my mind about who the muse was. It made sense that now, the feminine figure could possibly be a depiction of Mother Nature. A women who controlled the motion of the waves but herself had no motion. She was the cry they knew but was not of there own. The song was not the water, it was the wind as it crashed itself against the water, always pushing against that barrier. Every and all aspect led to this idea that the love was not a love of a woman, but a love for the nature of women itself. The presence, something much larger than im, controlling all of the wonderful things he so desired and felt for. I was so sure about this notion, because I felt reassured by a verse. When the speaker said â€Å"it was she and not the sea we heard† I knew I had come across it all. Despite my reassurance, I instantly withdrew that notion when I came upon this verse, â€Å"repeated in a summer without end†. If the womanly figure was Mother Nature, then seasons would not be an issue. I was then left to recollect my thoughts. Sound, one of our five sense that allows us to soak up the chirping of the birds, crashing of the waves, and the beating of hearts. It seems to be the main drive of the speaker. Everything that the speaker explains comes from the song of Key West, the sound of Key West. Not knowing where it is from or what it is, the speaker so infatuatedly talks about a song and cry. I find it really ironic that the speaker creates a sense with the use of a sense. As you read you are painted a picture with the desire to listen to this song as well as ponder about the origin. The song, I believe, creates the desire to be at Key West and gives it life. To the speaker, the song becomes a song of tranquility amongst chaos, it calms him. The idea of order comes from the sounds that create the song of Key West. Once the song has stopped, the life it sang about trudges on. There is a kind of emptiness to the song, but it moves everyone who listens to it. It creates a connection with the listeners as well as brings their love of Key West to life â€Å"And when she sang†¦ whatever self it had, became the self†. This tune could be of their own life or the reason they come to Key West. It definitely paints the picture everyone goes there for. Sadly, when the song is over, it seems as if the love for the West isn’t as strong. When the speaker turns away, the song no longer is a beautiful melody of the ocean, but a cry. The cry, a constant longing of Key West to have visitors and of the speaker to return again. Only during the summer does the speaker visit the Keys. Since he is only able to visit once every year, the need to visit as well as the Keys need for visitors builds up. Both with the longing to reunite, the cry is heard. There is a strong connection with the speaker and Key West. The speaker carefully describes the beauty of the beach as if it were a women. Every hour spent at the beach is precious. As the sun egins to set, the speaker gets an unsettling feeling. Even though he comes back every summer, it is painful for him to leave such a hypnotizing place. As the day comes to an end, the song seems as if it becomes slower. Creating everything that Key West is, as the song comes to an end, so does its surroundings. Fishing boats go back out to sea, the light begin to turn on, and the speaker has to tear himself away from his love. Time is of the essence and in no sense wasted when the speaker visits Key West. â€Å"She measured it to the hour†, the song is perfectly measured out between sunrise and unset. This then makes it easier for the speaker to leave the beach, allowing him to go about his daily life. Then there is the mention of another man, Ramon Fernandez. The speaker looks up to him, asking if he knew why the melody was ending. I just came to the conclusion that Ramon was nothing but a man who was along for the ride. The speaker probably just asked him if he was interested in seeing Key West. Ramon has no deep connection with the coast unlike his chaotic friend. Although, he seems as if he is good company. He provides the speaker a chance to express his displacement with the song nding as well as the day coming to an end. Key West as a whole can be interpreted as something desired. Expressed like a love for a women, the beaches of Key West provides the speak er with a peaceful place. He longs for the passion, comfort, and peace that the coast grants him. The possibility arises that the speaker was never able to truly express his love until arriving at the coast. There is no sure reason that the speaker feels such a deep connection with Florida. Maybe he lived there as a child, hearing the sounds of the ocean, wind, and creatures daily. Then when he would come back summer after summer, the sounds and sights hanged much like he did with each passing day. The speaker is constantly going back to a later time when things were as they picture them as a child. The song could represent the passing of time, as the day ended, he came to the realization that the beach was not what it used to be. The beach lifestyle being calm and easygoing, allowed the speaker to feel at peace. So then when the speaker left this lifestyle behind for another one, he realized the chaos was too much for him to handle. Sadly he was not able to return for whatever reas on, except once a year, every year when the weather was at its hottest. A possibility could be that there was a job, family, and or life experience that was calling his name. Something of a forceful nature that caused him to leave. In his absence, the coast cried out for him, desperately trying to bring him back to peace. He did not know the cry was for him at the time, but once he came back, it became real. His love for Key West, for his old life was no longer in his grasp. The speaker could no longer turn back time and enjoy all those years he had flash before his eyes. Another interpretation could be that the need to be that Key West represents some sort of psychical or emotional need. Something that cannot be fulfilled by every day life. Key West is a tropical place, there are always exciting, fun, and new things to try. It is a freeing place where anything and everything is accepted. It is easy to find yourself in a social acceptable setting. Depending on the person, different settings can be more opening to others. For example, many people go to New York because they are widely accepted. All in all, Wallace Stevens wrote a cavern of a poem. Always going in deeper, seeing new perspectives, and discovering something new. The Idea of Order at Key West could be interpreted into ust about anything for anyone. Stevens so delicately thought out every single detail, making it such a beautiful read. Carefully unwrapping each sentence, I find myself longing to know more. In the end, what Stevens really wanted was an admirer. Someone who craved the words written by him. An adorer who would stop for nothing to know what his next thought would be. What creator doesn’t want someone to admire their work ? Creating a vivid picture with every word, Stevens captured the essence of the thirst for love and desire. The Idea of Order at Key West was only just the foot in the door of this new way of writing. How to cite The Idea of Order at Key West, Papers

Saturday, May 2, 2020

Military’s Impact On My Life Sample Essay Example For Students

Military’s Impact On My Life Sample Essay Writer’s Checklist for Writing a Narrative:* 1. Be my rubric and debut enticing?* My rubric and debut is in my sentiment luring. *2. Be my thesis effectual?* I believe that my thesis statement is really effectual. *3. Have I included plenty inside informations so the reader can visualise my experience? * The inside informations included in my essay should give the reader a clear position on my experience. *4. Are the events presented in a logical sequence? * The events included in my essay are presented in a logical sequence. *5. Have I used passages to assist the sequence of events flow swimmingly? * I have used passages to assist t sequence of evens flow swimmingly. *6. Have I used duologue ( if appropriate ) ? * If duologue was appropriate it has been used.* 7. Have I used a consistent point of position and verb tense? * In my essay I have used a consistent point of position and verb tense. *8. Is the point of my narrative evident?* The point of my narrative is apparent throughout the essay. *9. Have I ended the narrative satisfactorily?* I believe and feel I have ended the narrative satisfactorily. *10. Have I proofread exhaustively?* I have proofread thorough. and besides had another cogent evidence reader read my narrative througly. ( Adapted from Write Now. pp. 110-111 ) The minute that had the most impact in my life would be when I joined the United States Army. Before the twenty-four hours that I signed up I neer in my life pictured that I would be where I am today because of the Military. The twenty-four hours that I left for basic preparation was the beginning of a whole new life. I joined the Army July 27th 2009. and at the clip I was still under the age of 18. I had to hold my parents consent. and they were in full support of my pick to enlist. This didn’t come to a large surprise to my parents. because my older brother was already enlisted. functioning clip in Iraq. He had a large influence in my determination because I watched him go a better individual and wanted to follow in his footfalls. Equally shortly as I had seen how much. for the better. my brother had changed and grown into a much more mature immature adult male. I knew this is what I non merely needed. but what wanted to make. When I foremost realized my whole life was traveling to alter dramatically was when I went through basic preparation. The twenty-four hours of Graduation as I looked out and saw my parents for the first clip in six months was one of the greatest and happiest minutes of my life. Right so and at that place I knew I had accomplished what merely one per centum of America has achieved. During my clip served. I neer thought in my life I would hold traveled to the bases. and states the military brought me to. Bing in all different parts of the universe. particularly Baghdad Iraq. had a immense impact on non merely my life. but on how non to take life for granted. Sing the manner they lived over seas. in a war zone. has made me perfectly thankful for the friends. household. fiance . and life I have and live freely here in the United States. Friends and memories came rapidly during my clip served as an active responsibility member of the armed forces. Today I still maintain in touch with many of the friends I met over the three old ages I was in. Our deployment together brought us closer than of all time. and I consider each one of them a brother to me. Anytime a job occurs in my life. if my fiance is non around I know I can tilt on any one of them for their full support. Whenever I call I know that I will acquire an reply every individual clip. and this has an astonishing impact in my life by holding more so adequate support. It is non merely the friends that impact my life. but the completion of my service has now set me up for nil but success in my hereafter. Using the GI measure I am non merely taking college that is to the full paid for. but besides receive a allowance that helps out with the rent I must pay. and the nutrient I buy. .u9f337a77f9914f0893c6b4e2668efc73 , .u9f337a77f9914f0893c6b4e2668efc73 .postImageUrl , .u9f337a77f9914f0893c6b4e2668efc73 .centered-text-area { min-height: 80px; position: relative; } .u9f337a77f9914f0893c6b4e2668efc73 , .u9f337a77f9914f0893c6b4e2668efc73:hover , .u9f337a77f9914f0893c6b4e2668efc73:visited , .u9f337a77f9914f0893c6b4e2668efc73:active { border:0!important; } .u9f337a77f9914f0893c6b4e2668efc73 .clearfix:after { content: ""; display: table; clear: both; } .u9f337a77f9914f0893c6b4e2668efc73 { display: block; transition: background-color 250ms; webkit-transition: background-color 250ms; width: 100%; opacity: 1; transition: opacity 250ms; webkit-transition: opacity 250ms; background-color: #95A5A6; } .u9f337a77f9914f0893c6b4e2668efc73:active , .u9f337a77f9914f0893c6b4e2668efc73:hover { opacity: 1; transition: opacity 250ms; webkit-transition: opacity 250ms; background-color: #2C3E50; } .u9f337a77f9914f0893c6b4e2668efc73 .centered-text-area { width: 100%; position: relative ; } .u9f337a77f9914f0893c6b4e2668efc73 .ctaText { border-bottom: 0 solid #fff; color: #2980B9; font-size: 16px; font-weight: bold; margin: 0; padding: 0; text-decoration: underline; } .u9f337a77f9914f0893c6b4e2668efc73 .postTitle { color: #FFFFFF; font-size: 16px; font-weight: 600; margin: 0; padding: 0; width: 100%; } .u9f337a77f9914f0893c6b4e2668efc73 .ctaButton { background-color: #7F8C8D!important; color: #2980B9; border: none; border-radius: 3px; box-shadow: none; font-size: 14px; font-weight: bold; line-height: 26px; moz-border-radius: 3px; text-align: center; text-decoration: none; text-shadow: none; width: 80px; min-height: 80px; background: url(https://artscolumbia.org/wp-content/plugins/intelly-related-posts/assets/images/simple-arrow.png)no-repeat; position: absolute; right: 0; top: 0; } .u9f337a77f9914f0893c6b4e2668efc73:hover .ctaButton { background-color: #34495E!important; } .u9f337a77f9914f0893c6b4e2668efc73 .centered-text { display: table; height: 80px; padding-left : 18px; top: 0; } .u9f337a77f9914f0893c6b4e2668efc73 .u9f337a77f9914f0893c6b4e2668efc73-content { display: table-cell; margin: 0; padding: 0; padding-right: 108px; position: relative; vertical-align: middle; width: 100%; } .u9f337a77f9914f0893c6b4e2668efc73:after { content: ""; display: block; clear: both; } READ: A Modest Proposal Rhetorical Analysis EssayThe life I live merrily today is owed greatly to the pick I made in fall ining the armed forces. It has impacted my life significantly. and in every individual manner it has bettered me as a adult male. As I continue my instruction. utilizing the GI measure I believe to hold earned for myself. I will ever look back at the twenty-four hours I enlisted and cognize I made the greatest pick of my life as of today. I look frontward to what the hereafter will now convey me. and the successes I will go on to do because of the impact fall ining the armed forces has made in my life.

Sunday, March 22, 2020

St. Augustine On Death Essays - Amillennialism, Augustine Of Hippo

St. Augustine On Death Death is a very natural occurrence in life, and everyone experiences death differently, but yet in the same way. When Augustine was a young boy his father died, and he makes a small account of this in the Confessions. Later on in life, he loses a dear friend, and his loving mother. With time, he mentally matures and death affects Augustine differently each time. The death of his father was merely mentioned in the Confessions, while the death of Monica, his mother, was an elaborate detailed account of the time of her death. The death of his close friend, when Augustine was a child made him realize that life is temporal. Growing up, Augustine was not very close to his father. He confided in his mother and leaned towards her Christian beliefs. Patricius, Augustine's father, was a pagan, but later became a catechumen. Patricius did not pressure Augustine about following his mother's beliefs, and gave him the freedom to do so. When Augustine was a child, he was subjected to the verbal abuse his father laid on Monica. His father was also not faithful, and this left a lasting scaring impression on Augustine. Patricius never hit Monica, and she realized that other wives were being beaten, so she accepted the verbal abuse. Patricius was proud of his son's accomplishments, and was admired by all for the sacrifices Patricius made for Augustine. Patricius was considered"generous," but then was also very "hot-tempered." In the Confessions, Augustine only makes note of his father's death, and one reason may be that Augustine was not happy with the way Patricius treated his loving and ever-forgiving mother. Shortly after Patricius' death, Augustine deals with death once more, with his childhood friend. In the Confessions, Augustine tells of a close friend he had as a child growing up. They both went to school together, and enjoyed each other's company. "...I had come to have a friend who because of our shared interests was very close. He was my age, and we shared the flowering of youth. As a boy he had grown up with me, and had gone to school together and played with one another..." Augustine and this unnamed friend knew each other for a short time, yet Augustine felt that he was losing someone he had known all his life. "You [God] took the man from this life when our friendship had scarcely completed a year. It had been sweet to me beyond all sweetnesses of life that I had experienced." The unnamed friend came down a bad fever, and he was baptized while he was unconscious. Augustine felt as if this baptismal sacrament would have no affect on him and he would carry all the sins of his childhood. The unnamed friend did awake from his unconscious state and Augustine and the friend had a minor conflict over a joke Augustine made over the friend's baptism. The friend did not find it a laughing matter, but they did resolve the conflict. Augustine left for a few days and while he was gone, his friend passed away. Augustine explains that he was stricken with grief from the death of his friend, that made him want to leave his hometown. Everything made him think of his friend, and he was always looking for him. Augustine was constantly weeping and was a wreck. "My home became a torture to me; my father's house a strange world of unhappiness; all that I shared with him was transformed into a cruel torment. My eyes looked for him everywhere, and he was not there. I hated everything because they did not have him...I had become to myself a vast problem..." Augustine explains that during this time of sorrow, he did not look towards God for help, and was too wrapped up in the misery of the death of his friend. One thought he had was that he was angered by the fact people in general do not realize that they are on this earth for a short time, and they do not understand the temporality of life. "What madness not to understand how to love human beings with the awareness of human condition!" With this sorrow, Augustine moves from Thagaste to Carthage. The third death Augustine had to confront in his life was that of his mother's, which ends the biographical accounts in Augustine's life. During days of Augustine's childhood, Monica felt as if he was the "son of tears." He turned away from Catholicism, and became a Manichean. Monica greatly disapproved of

Thursday, March 5, 2020

Symbols in Fahrenheit 451 Essays

Symbols in Fahrenheit 451 Essays Symbols in Fahrenheit 451 Paper Symbols in Fahrenheit 451 Paper Essay Topic: Fahrenheit 451 As spoken by Socrates â€Å"The secret of change is to focus all of your energy, not on fighting the old, but on building the new†. Focusing on change and putting all your energy in changing what is wrong is what Ray Bradbury is expressing in the novel Fahrenheit 451. This novel is about one man named Guy Montag is set on a path by multiple people to change society and make it a new dawn of humanity. Bradbury asserts three main symbols. The Phoenix, which embodies rebirth of mankind and the nature of history, mirrors which represent seeing oneself and understanding what has happened, the last symbol blood personifies someones instinctive self. Right up front, the Phoenix embodies the ability for mankind to see one’s mistake and fix the mistake and learn not to do it again. For example in the novel Fahrenheit 451 Granger states â€Å"We know all the damn silly things we’ve done for thousands of years, and as long we know thatsomeday we’ll stop making goddamn funeral pyres and jumping in the middle of them†(156). Granger makes a direct comparison to human beings and the Phoenix. They both destroy themselves in a shroud of fire, but both start again in the ashes. If the people in the society kept the books which preserve the past and allow people to learn the lessons of prior tragedies. Granger hoped that humanity will remember the suffering caused by destruction, and will avoid destroying itself in the future. Granger clearly statesâ€Å"We’re remembering . . . And some day we’ll remember so much that we’ll build the biggest g______ steam-shovel in history and dig the bigges t grave of all time and shove war in and cover it up†(157). He is saying, ask yourself one question what we’re doing and you can say â€Å"We’re remembering†(157). Granger is saying when somebody remembers then that will be the dawn of fixing our mistakes, but we don’t fix them because we don’t look ourselves in the mirror and try to fix it. The

Tuesday, February 18, 2020

Homeland Security - Predaredness & Prevention Assignment - 4

Homeland Security - Predaredness & Prevention - Assignment Example Such trainings/exercises are significant to attain a collective goal or objective since it provides opportunity to identify areas of strengths and weaknesses that can be corrected before an actual incident of the same kind occurs (US Department of Homeland Security, n.d.) These exercises or training will enhance preparedness in all first responders who in any situation will normally commence on the same footing, hence making them aware on how to respond effectively to small, medium and large-scale emergencies (US Department of Homeland Security, n.d.). Equally crucial to first responders is being provided with reliable information or data regarding a certain emergency or mishap. This being the case a solid and dependable system of information from all credible sources is needed to determine the actions that must be taken. This entails having a common and ultimate goal for all the responders so a consistent and unbiased approach is drawn from technical and other collection efforts (Th e Provisions of Executive Order 12333, 1981); which will however require all heads of the executive branch departments and agencies to submit timely responsive information necessary to effect programming and budgeting that will sustain the flow of reliable information for appropriate action implementation (The Provisions of Executive Order 12333, 1981). The Provisions of Executive Order 12333. (1981, December 4). Executive Order 12333 – United States Intelligence Activities. Retrieved from

Monday, February 3, 2020

Quality Management High School Essay Example | Topics and Well Written Essays - 500 words

Quality Management High School - Essay Example Focusing on intangible effects on processes and ways to optimize and reduce their effects. Examination of the way the organization applies the product aimed at improving the product itself and Broadening management concern beyond the product. TQM is mainly concerned with continuous improvement in all work, whether in strategic planning and decision-making or at the supervisory level. It is based in the belief that, mistakes are avoidable and their effects are preventable. It leads to continuously improving results, in all aspects of work, as a result of continuously improving capabilities of workers, processes and technology. TQM is very key to achieving efficiency in the health sector in that it ensures that an organisation maintains a quality standard in all aspects of its business and undertakings. This involves doing things the right and therefore eliminating wastage and losses from the organisations operations. The Centres for Disease Control and Prevention (CDC) is one of the major operating components of the Department of Health and Human Services, an agency, in the United States government for protecting health and safety of the Americans and other needy people throughout the world. CDC concerns itself with prevention and control of infectious and chronic diseases, injuries or workplace hazards, and environmental problems.

Sunday, January 26, 2020

Basement Car Park Design

Basement Car Park Design A basement car park has to be design in this project to meet the property developers requirement. The car park will have 3 below ground level as the figure attached in the appendix (page 2). A site investigation has been completed and supplied as the information in this project. The construction technique for the basement walls has to be identified, then design the basement walls and produce a report justifying the solution. 1.2 Project Aim and Objective This project title is set up for student who is having their third year study in Civil and Structural Engineering. The objective of this project is to reflect the design and construction process of a geotechnical structure that students are likely to encounter in their future industry life. There are several aim have to be achieved in order to meet the objective in this project. Those aims are: To gain the overall thinking in a project construction and understanding those factors influence the development of the project. To gain deeper knowledge in the geotechnical field such as type of retaining structure and soil profiles. To develop the rational thinking and view of the constructability of the project. To identify the engineering problems in a project and minimize it to the minimum. To justify the proposed concepts into engineering fields. To apply engineering thinking into a project and design the structure in accordance. To communicate with the supervisor for seeking appropriate advice and self study to complete the project. 1.3 Project Scope This project had been separated into two main parts which are conceptual design and detailing design. In the conceptual design part, the choices of pile have to be considered wisely and justify it before get into the detailing design part. In this project, there are several type of retaining structure can be used but just the most appropriate one will be chosen to carry out into the detailing design part. There are few factors have to be concerned while selecting the choice of retaining structure. Those factors are the type of soil, durability, constructability, estimated costs and others. By having a good comparison among type of retaining structure, then the most adoptable type of retaining structure will be selected to construct the retaining wall. For the detailing design part, an adequate design calculation has to be produced in order to show that the retaining structure is satisfied with several circumstances and sufficient drawings have to be prepared if needed. The construction sequences have to indentify and list out clearly. Last but not least, a detailed method statement for the safe construction of the building including any supporting risk assessments, and an outline construction programs in the form of a bar have to be provided. 2.0 Background Study and Constraints The background study is the first stage of this entire project and a work must to be done before a project begin to progress on. The main purpose of this stage is to gather information as much as possible and analysis to figure out the restriction of the project. There must be some restriction in every single project that has to be concerned and further rational thinking to manipulate a good design. The discussion of the constraints has to be done in the early part of the project then the better final design will be produced by passing through this process. 2.1 Deep Excavation and Site The site tolerance is limited due to a public highway located just next to the footpath which is 2m away from the site. There must be some disturbance will face by the public highway due to this significant issue. This point has to be considering while choosing the type of retaining structure to be construct and minimizing it to the minimum when the construction is going on. Deep excavation has to be taking part in this entire project, so the hazards of deep excavation either supported or unsupported case has to be indicated and it is a considerable concern while making decision for the type of earth retaining structure. For example, the dewatering problems might be exist base on the water table and the excavation is variable base on different type of soil in the area as well. 2.2 Soil Profiles The soil profiles are the interesting and concerning part for the geotechnical engineering especially the engineering soils found beneath the topsoil [1]. The engineering properties and the behaviour of these soils are their concerning and interesting point [1]. Different type of soil profiles will be having different ability for a structure. Therefore, site investigation process has to carry out to determine the soil profiles. The layer and the type of soil or rock beneath the ground surface will be determined by this process. Its behaviour and the properties of each layer will be obtained as well to progress on. In this project, there are three boreholes given from the site investigation data which named as BH-02, BH-03 and BH-09. The boreholes record is attached at the back of the report which in the appendix part (from page 1 to page 2). The location of BH-02 and BH-03 are shown inside the plan view of the site but there is nothing relevant to BH-09 can be figured out from the view. The plan view is attached in the appendix (page 1). A simple analytic of the height and depth of each layer have done which shown in the Figure 2.1, 2.2 and 2.3. C:UsersFuhDesktopZzz_Study thingsCIVE 3709ProjectIMG_0619.JPG Figure 2.1 Borehole Record, BH-02 C:UsersFuhDesktopIMG_0617.JPG Figure 2.2 Borehole Record, BH-03 C:UsersFuhDesktopIMG_0618.JPG Figure 2.3 Borehole Record, BH-09 From the figure of the three boreholes records, it shown that they are about the same. The soil profiles for the top layer is made ground then followed by clay and then mudstone as the bottom layer. Clay is a naturally occurring material composed primarily of fine-grained minerals, which is generally plastic at appropriate water contents and will harden with dried or fired. Although clay usually contains phyllosilicates, it may contain other materials that impart plasticity and harden when dried or fired. Associated phases in clay may include materials that do not impart plasticity and organic matter [14]. In the other hands, mudstone is a fine grained sedimentary rock which is formed by clays or muds with the pressure over long time. It looks like hardened clay but depending on the situation when it was formed. 2.3 Water level Groundwater observation where the water seeps or ingress has to be recorded in the site investigation logs as they link with the casing and the boreholes depth [2]. Groundwater observation is the concern for geotechnical engineering due to the water pressure too. The water pressure is an issue that will affect the decision of the choice of retaining structure and the depth of the pile as well. The water table is not given in this particular project specification therefore proper consideration is needed before making any assumption. The water level is to be assumed one meter below ground level after a long consideration and communication with supervisor. This should be the best assumption and go on for the later part of design. 2.4 Time, Cost and Quality As a designer, the concern of the property developer has to be taking into consideration while designing a project. Time, cost and quality are playing the important roles for a single project which will be the concern of the developer. These three elements are the key issues and related to each other. The cost of the project will be increased if a project construction time getting longer. Base on this, the shorter the construction period the lower the cost of the project so a proper planning of the construction method and procedure is needed to minimize the construction cost but the quality of the project must be still maintain in a satisfy adoptable level. 3.0 Type of Earth Retaining Structure Earth retaining structures are mainly used to support the soil and structure due to the difference in elevation of the ground surface. It can be either propped or cantilever. There is various type of earth retaining structures which are used in geotechnical field for civil engineering. Those retaining structure more commonly used in basement car park and more suitable for this project are: Sheet Pile Walls Diaphragm Walls Bored Pile Walls There is different capable of each type of wall, the typical applications of walls have shown in the figure below. Figure 3.1 Typical applications of embedded walls ([8] pages 98) 3.1 Sheet Pile Walls Sheet pile walls are made of timber or precast concrete previously but nowadays sheet pile walls are more commonly made of steel. Sheet pile walls are formed by individually driven sheet pile into the ground and form the series of interlocking piles to support the soil and the structure [1]. Sheet pile wall can be category into two main types which are cantilever wall and anchored wall. Sheet piles are light to handle and being robust. It can handle the high compressive loads whiles it driven into a hard ground surface [3]. It has the ability of being driven into deep penetration to reach a bearing stratum or to develop a high frictional resistance [3]. There are two method of driving sheet piles into stratum which is: Pitch and Drive This is the simplest method, each sheet pile or pair of piles will be driving into the finished level (full depth) before repeating the next sheet pile. By the way, this method is preferable for loose soils and short piles only. Panel Driving In this method, the first pair of piles has to be pitched carefully, plumbed and driven partly to form adjacent piles. Then, the remaining of piles are pitched and interlocked. Finally, the last pair of piles pitched into the panel are then driven partially and followed by the partial driving of the rest of the panel, working back towards the first pair in the panel [4]. The piles is arranged as whole panel, therefore it is no need to drive all piles fully to maintain the piling operations. The risk of driving problem and difficulties of de-clutching will be minimised too [5]. This method is suitable for dense sands and stiff cohesive soils. http://www.earthwork.us/files/DSCN2063.JPG Figure 3.2, Sheet Pile Walls There are few issues have to be discuss while considering to be used sheet pile walls for design. Firstly, the deep of the basement has to be constructed. If the depth of the basement too deep which mean the length of the pile will be quite long and the ability of transporting, pitching and driven those piles has to be taken into consideration especially in urban area. Cost will be affected in this issue as well because it is hard to manufacture a big size of sheet piles. Basement car park recently constructed in urban area to fully utilize the space in the cities. While sheet pile walls can be act as a permanent structure or temporary work in a construction project, but there is a concern if the sheet piles act as the temporary work. The ability to remove the sheet piles after constructed the retaining structure has to be think twice base on the limited spaces around the cities for the crane to remove it. Even there is some improvement of the technology on the noise and vibration problems for sheet piles while driven it into the stratum but vibration and noise are still exit which is the disadvantages of sheet piles. The improvement just mainly overcomes the problem on some type of soil layer only, such as by using some hydraulic pressure equipment to press the sheet piles into stiff clay layer. Refer to this entire issue; there must be rational consideration if steel pile has to be used specially in the urban area. 3.2 Diaphragm Walls A diaphragm wall basically is the combination of reinforced concrete wall and sheet pile wall. It has the ability of the combination of reinforced concrete and sheet pile wall. A diaphragm wall are formed and fixed by vertical reinforced concrete slab in position with the same manner to support the soil. In the other hand, the sheet pile held in the lower part of the diaphragm wall by the passive and active soil pressures that act upon it [1]. Most of the diaphragm walls are the reinforced concrete wall that cast in situ by a machine digging a trench in panels of limited length. It acts as temporary support during construction and a permanent wall, sometimes with lining [8]. The stability of the excavation to the required depth is filled by the use of a drilling fluid, usually is bentonite slurry [6]. This slurry has thixotropic properties, as it forms into gel when left undisturbed but becomes a liquid when disturbed [1]. The bentonite slurry initially penetrates into the soil and the virtually impervious skin of bentonite particles is formed [1]. It is only about few millimetres thick on the sides of the trench. There is no penetration of the slurry into clays, sand and silt water. The main purpose of the use of slurry is to prevent collapse of the trench by creates lateral pressures that act on the side of the short trench panel. When the excavation is done, the required steel reinforcement is place into the trench panel. The walls are constructed by filled with concrete in discrete panel lengths ranging typically between 2.5m and 7.0m using purpose in appropriate circumstances. Those displaced slurry being collected for cleaning and further use. Standard widths of diaphragm walling equipment are 600, 800, 1000, 1200 and 1500mm although greater can be provided as required. Depths of the diaphragm wall are constructed up to 50m by using grabs and up to 80m using standard hydromills (milling machines). The remaining intermediate panels are excavated and constructed to fully complete the wall when the concrete has developed sufficient strength. The length of each panel is limited to the amount that the soil will arch, in a horizontal direction, to support the ground until the concrete has been placed [6]. A simplified Figure 3.3 has been attached to shown the various construction stages. In the Figure 3.3, the processes of each stage are: Guide-wall construction Panel excavation in progress Installing stop ends Panel concreting Figure 3.3, the stage of construction a diaphragm walls. http://www.stroyinject.com/images/gallery/pics_new.08.08/thumb_SZ_2.JPG Figure 3.4, Diaphragm Walls There still exists another type of diaphragm walls which are precast reinforced concrete diaphragm walls. The use for this type of diaphragm wall is nearly the same with diaphragm wall that reinforced concrete cast in situ. It provides both temporary and permanent soil support but with limited depth. There must be some advantages and disadvantages for every single earth retaining structure. Therefore the discussion of pros and cons for this type of retaining structure has to be done, while considering of using diaphragm walls. The construction time and cost of diaphragm wall is generally efficient where it is used for both permanent and temporary subsoil retention for walls of medium, and greater, depth [8]. Diaphragm walls also allow the effective transfer of vertical load from the building superstructure to subsoil below basement level. The vertical load transfer is not added in the wall design while the early of diaphragm wall in UK. The reluctance of designers to allow such load transfer was due no doubt to lack of published test results. This situation changed gradually when the diaphragm more commonly use in the construction of basement [8]. While constructing the diaphragm walls, it has the minimum noise and vibration disturbance. This is an advantage of using diaphragm walls as a retaining structure. The noise and vibration in diaphragm wall installation are about the same compare with the normal civil engineering equipment, such as cranes and generators. Base on this, it suitable to be constructed in urban area. Diaphragm walls can be constructed under groundwater condition so there is not any affection in groundwater problems for this kind of structure. Diaphragm walls have the advantages of high bearing capacity and good in horizontal or vertical bearing capacity. The allowances of settlement for this kind of structure are small which is good for superstructure [9]. Although there are many advantages of using diaphragm wall but there is some limitations for this structure to be used. It could not be use either in very soft soil such as soft clay due to trench stability problem or very stiff rock. The principal disadvantages of diaphragm walling are the risk of loss or spillage of bentonite slurry, the relatively high cost of cleaning and the disposal of the slurry, the site space needed for large reinforcement cages and the large cranes needed to handle them. Above all, the need for continuity in the construction process from excavation through concreting to removal of temporary stop formers is a disadvantage of the method [8]. A good quality control is needed in the diaphragm wall construction. Diaphragm walls are the new type of retaining structure which is more modern and construct by some modern equipment. Those skilful and more specialist workers needed while installation the walls. 3.3 Bored Pile Walls Bored pile walls are an earth retaining structure that form by bored cast in situ piles either small or large diameter. This technique often used in deep basements and underground structure as a temporary or permanent retaining structure. It commonly used for those structures with limited working space or constraint of adjacent existing structures that prevent excessive bulk excavation and help to control the movement of the ground [6]. The construction method of bored pile walls are slightly different compare to the diaphragm wall, initially a casing has to be driven into the ground by using the vibro-hammer and leaving 1 metre length of the casing above the ground. Casing can be ignored where the soil profiles are firm to stiff cohesive soils [11]. The power-driven rotary auger (a drilling tool) will be used to cut and remove the soil within the casing to form a borehole. The range of diameters and depths possible is considerable, from 300 to over 5000mm and down to 100. The used of the casing is to support the surrounding soil. If the length of the casing not enough long to reach the required depth in the ground, bentonite slurry could be used to support the soil below the casing. The steel reinforcement will be lifted up and placed into the borehole by crane. If the depth of the boreholes too deep, reinforcements have to be over lapping and welding if possible. The concrete is poured into the borehole to form th e bored pile. Finally, the bored pile is formed by using the vibro-hammer to withdrawn the casing [3][10]. A bored pile wall has its own characteristic that have to take into consideration while selecting the type for retaining structure. The presence of the advantages and disadvantages of the bored pile walls have to be taken into consideration if bored pile walls chosen to be used. The length of bored pile walls can be varied to suit the varying ground condition which is more adoptable for most of the design project. Moreover, the soil can be inspected and if necessary sampled or in situ tests made when it is cut and removed from the boreholes. By using this method, the large excavations and subsequent backfill are eliminated. The noise and vibration are existed while constructing the bored pile but it is acceptable and will not disturb the adjacent pile or structure [12]. Basically, the disadvantages of bored pile wall are not much. The transportation of the casing could be one of it. The unable to place the concrete under the ideal condition and cannot subsequently inspected are one of the disadvantages as well. Figure 3.5, the steps of constructing contiguous bored pile walls. Bored pile walls are categorised into two types, which are: Contiguous Bored Pile Walls Secant Bored Pile Walls Several factors have to be concerned while choosing the type of bored pile walls. Those factors are: Soil Type The ground water profile Construction time available Propping requirements Cost Life span 3.3.1 Contiguous Bored Pile Walls A single row or double row of piles pitched and constructed next to each other with leaving some gaps. Alternative piles are cast first and the intermediate piles are then installed. Figure 3.6 and Figure 3.7 are attached for more detail and understanding. For this type of retaining structure, the water will flow through the gaps between piles [1]. This type retaining structure suitable where the soils are between firm to stiff and the water level is below the depth of excavation. This method is the fastest method and most economic option to construct. Figure 3.6, an example for the plan view of contiguous bored pile wall http://www.sbe.napier.ac.uk/esm/images/bored_pile_small.jpg Figure 3.7, contiguous bored pile wall 3.3.2 Secant Bored Pile Walls Secant bored pile walls are similar with the contiguous bored pile wall, except that the gap of the piles are either filled with concrete or secondary pile are cut into the primary piles as shown in Figure 3.8 and Figure 3.9.This technique is suitable for high water level due to the continuous wall had formed and it is a watertight condition that stops the inflow of water. The procedure of this method is slightly more complicated compare to bored pile wall. Figure 3.8, an example of plan view of secant bored pile walls http://www.amplusltd.com/upldimages/ISecant%20piled%20wal%20-%20Battricks%20-MG_0042.jpg Figure 3.9, Secant bored pile walls 4.0 Comparing and Selecting Of Retaining Structure. By using a simple matrix analysis table as shown in Table 4.1, it can be determined the best selection of retaining structures as in general concept. The selection of the retaining structures can be determined by rational comparisons by applying the weighting into the matrix table. The weighting in the matrix table are represented with numerical numbers from 1 to 3 in which the higher the value, the more beneficial for the route while the lower the value indicates as otherwise. From the table, it shown that each type of the retaining structures is about the same, they have their own characteristic and advantages in different aspects. Secant bored pile walls gained the most point in the weighting but it might not be the best choice because this is just a general concept comparing within the type of retaining structures so a proper comparison that fit with this entire project issues will be done later on. The soil profiles of this project are made ground, firm to stiff clay and mudstone which adoptable for all of the retaining structure mentioned above except sheet pile walls. In this soil conditions, sheet pile walls are not suitable to be driven into the ground due to the hardness of the mudstone layer. This problem can be solved by providing bigger size of sheet pile which significantly increased the cost and waste of materials. Therefore, sheet pile walls are not recommended and if possible choose other type of retaining structure into design. Water level is a problem which will be affected the decision of selecting retaining structures. The water level is to be assumed at 1m below ground level. It is quite high and proper consideration has to be done base on this issue. Diaphragm walls, sheet pile walls and secant pile walls are capable to construct in high water level condition. Contiguous pile walls are not able to construct below ground water condition due to the gaps between the piling which allowed the inflow of the water. This might a concern while selecting this as the retaining structures. Diaphragm walls are a good retaining structure among all of the retaining structure. It allowed the highest depth of excavation which is about 7 to 30m length but 8m of excavation is sufficiently enough in this entire project. In the other hand, the other retaining structures are more adoptable which allowed 4 to 15 or 20m depth of excavation length. This will be an issue while selecting the choice of retaining structures. Basically, there is specific difficulty of constructing each type of retaining structures just in different restriction. There is not much to comment on the ease of construct issue but it must be fit with the site restriction. The durability of each type retaining structure is about the same and it could be ignored while comparing with each other. The cost of construction must be minimizing to the minimum if possible because it is a concern of the project developer and economical problem. Sheet pile walls are rejected in this project due to several concerns. First, the main concern of using sheet pile is the size and area of the pile to be used due to the depth and area of excavation are quite big. It is hard to manufacture such big size of sheet pile in the factory and hard to transport large number of them to the site. If sheet pile chosen into design for basement car park, it will commonly act as temporary work and the ability to withdraw the sheet piles after the construction is an issue because a highway just located 2m away from the boundary of the site. Moreover, the soil profile contains lot of the mudstone which cause the sheet pile hard to be driven into the ground. There will be some vibration which will be affected the public highway either on the foundation or the whole structure while the sheet pile is driven into the ground. Diaphragm walls are good to be used in basement construction which is commonly in urban area. Honestly, it is capable with all the construction constraints in this entire project such as it is able to construct under groundwater condition and there isnà ¢Ãƒ ¢Ã¢â‚¬Å¡Ã‚ ¬Ãƒ ¢Ã¢â‚¬Å¾Ã‚ ¢t any vibration problem in diaphragm walls construction. Even it is so good compare with other retaining structures but it still will not be selecting as the retaining structure. First, large amount of steel reinforcements needed for a diaphragm walls, it have to be tied up before they lifted up by crane and placed into the panels. Base on the number of materials and skilful workers needed, the cost of the construction will increased directly. It is also relatively high cost of cleaning and the disposal of the slurry. Diaphragm walls are good enough which is a bit over for this project because some of the advantages is not needed in this project. Consequently, diaphragm walls are not suitable for this p roject and some other retaining structure will do because the overall estimated construction cost is too expensive compare with others. Bored pile walls are the most adequate retaining structure to be used in this project compare to the others. Even there are some disadvantages in this type of retaining structure but the advantages of using it are higher after proper consideration and comparing. Then, the vibration and noise of constructing bored pile walls are in the acceptable range and will not affect those structure next to it especially the public highway. Bored pile walls are able to consort with the soil conditions in this project too. It is the cheapest retaining structure as well. Bored pile walls are chosen either secant bored pile wall or contiguous bored pile wall. As a conclusion, secant bored pile wall is chosen as the retaining structure in this project because it offers a watertight alternative compare with contiguous bored pile walls. 4.1 Selected Retaining Structure à ¢Ãƒ ¢Ã¢â‚¬Å¡Ã‚ ¬ Secant Bored Pile Walls Secant bored pile walls basically are bored cast in situ piles either small or large diameter. It will be constructed in a line and the gap between piling will be filling with cement or concrete to form a watertight condition for preventing the inflow of water. The filling technique will be mentioned in the later part of report. Secant bored pile walls are categorised into 3 types which are: Hard / Soft Secant Pile Wall Hard / Firm Secant Pile Wall Hard / Hard Secant Pile Wall 4.1.1 Hard / Soft Secant Pile Wall The female pile has a characteristic compressive strength of 10-20 N/mm2, which is retarded to reduce the strength of the mix while the mail piles are drilled between the female piels. 4.1.2 Hard / Firm Secant Pile Wall 4.1.3 Hard / Hard Secant Pile Wall